How much unplanned downtime can your project afford?
An 800 t crane comes to a standstill – and with it the entire construction site.
That costs five-figure sums per hour, delays follow-on trades and risks contractual penalties. The cause? A seemingly “normal” screw that could not withstand continuous vibration.
This is exactly where Stahlberg comes in.
We take on your specifications – from a single high-strength special screw to a multi-level bill of materials – coordinate specialized manufacturers and deliver complete, documented assemblies before the first standstill threatens.
Why special fasteners are indispensable in crane construction
High load cycles:
millions of cycles on bolts and screws
Extreme outdoor conditions:
salt, heat, frost, shock loads
Zero-defect tolerance:
safety factor ≥ 4 for load-bearing structures
Complex geometries:
eccentrics, multiple angles, fitted transitions





